PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Laying out block at the 1st floor Facing South.jpg Started wiring the VAV boxes at the 3rd floor Facing South (2).jpg Started wiring the VAV boxes at the 3rd floor Facing South.jpg Started closing up the walls at the lower roof Facing West.jpg Prepping the slab on grade at the Boiler-Electrical Room Facing North-East.jpg
Previous page Prepping the slab on grade at the Boiler-Electrical Room Facing North-East
Prepping the slab on grade at the Boiler-Electrical Room Facing North-East